October 25, 2019
Site Photo

Site Update – October 25, 2019

Site Update – October 25, 2019: During the week of October 21, 2019, CTS completed installation of 26 of 76 injection well casings planned for the […]
October 18, 2019
Site Photo

Site Update – October 18, 2019

Site Update – October 18, 2019: During the week of October 14, 2019, CTS completed installation of 16 of 76 injection well casings planned for the […]
October 11, 2019
Site Photo

Site Update – October 11, 2019

Site Update – October 11, 2019: During the week of October 7, 2019, CTS conducted the following activities: Installed 11 of 76 injection well casings planned […]
October 4, 2019
Site Photo

Site Update – October 4, 2019

Site Update – October 4, 2019: The second phase of the interim remedial action began this week. This phase will use In-Situ Chemical Oxidation (ISCO) to […]
February 1, 2019
Site Photo

Site Update – February 1, 2019

Site Update – February 1, 2019: On November 2018, CTS completed the Electrical Resistance Heating (ERH) treatment phase of the interim remedy and reduced TCE in […]
November 16, 2018
Regenerative Thermal Oxidizer

ERH Update – November 16, 2018

ERH Update – November 16, 2018: On November 16, 2018, the ERH treatment system heating electrodes were turned off. Soil and groundwater sampling confirmed that the […]
November 6, 2018
Activated Carbon Treatment Units

ERH Update – November 6, 2018

ERH Update – November 6, 2018: ERH treatment system operating measures as of October 29, 2018: Average subsurface temperature was 101.5º C with a peak of […]
October 29, 2018
Activated Carbon Treatment Units

ERH Update – October 29, 2018

ERH Update – October 29, 2018: ERH treatment system operating measures as of October 22, 2018: Average subsurface temperature was 99.6º C with a peak of […]
October 5, 2018

ERH Update – October 05, 2018

ERH Update – October 5, 2018: ERH treatment system operating measures as of October 1, 2018: Average subsurface temperature was 102.7º C. The ERH system has […]